2023
Key
milestones
All of our invoicing completed
electronically, championing our
ambition to be digital by default
A total waste management service
implemented across the Group
The milestones identified below represent the
key objectives of the Carbon Management
Plan over short, medium and long term. An
action plan has been created with an analysis
of the benefit for each specific objective.
Worked with academia to present
a robust evidence base for the
modular and portable sector,
to drive net zero performance
improvements
Installed smart sockets at our Head
Office to reduce energy waste
2022
Voltage Optimisation units fitted
at the Wernick Buildings factory in
Kenfig, South Wales
Scope 3 emissions identified by
the CMP to start baseline measuring
Wernick Group committed to the Pledge to Net
Zero campaign, aligning our net zero target
with the Science Based Targets Initiative’s
(SBTi) 1.5°C pathway
Installed solar panels at our factory in York,
generating enough energy to power 60% of
the entire site
Introduced plug-in hybrid electric vehicles into
each grade within our company car policy
2024
Increased solar generation capability across our estate
to 417 kWp, generating 13% of our own renewable
energy
All offices and factories now fitted with low energy
lighting
All offices to have double glazed windows
All company cars transitioned to Plug in Hybrid
Electric Vehicles